top of page

Short Answer 4 Days
We understand the construction industry moves fast and we do everything in our power in be as responsive as possible for our clients. However the Airspace is controlled by the FAA and we need to check it before we accept any job including aerial Drone work. If the job is in controlled airspace the FAA requires us to apply for flight clearance no less than 72 hours in advance and in highly sensitive areas id can take up to 90 days to achieve clearance.

However if the job is in open airspace we can get there as soon as our schedule allows sometimes as fast as the same day

Dudley, MA 01571 | info@jhwimaging.com | Tel: (617) 655-3332

© 2025 All images and videos copyrighted to JHW Imaging / James Wojdylak

  • Facebook
  • Instagram
  • Youtube
  • LinkedIn
bottom of page